Saturday, May 31, 2008

tireds...

today has been a crazy day. since yesterday night actually. i've bought a new game, and played till the wee hour. this morning we woke up at 7 to go buy 2 switches from amk, and went to wait for our lights delivery in sk.

and i skipped my jap class, sit on this chair, played from 10am straight till 4pm. now i'm a little giddy, and very hungry..

catching this tonight!

Thursday, May 29, 2008

we love our contractor!

we're begining to love our contractor!!!!! our L box was very prettily donee!!! wohoo!!! and he did a very nice 'ting' for our air con!!
our study room: the circled below is suppose to be our aircon pipe and trucking.. but he actually boxed it up for us!!! so its hollow if u knock it,please be gentle with it if you happen to come our hse nex time..
and our new tingy he did for our study room!!!
--> before
--> after!!!!
very happy!!!! our homogenous tiles gonna be up next!!!!

Tuesday, May 27, 2008

tiring part 2..

More post on our tiring trip before i say.. gonna say a damn scary scene that we saw while taking our spree items at bukit batok. this father hit his less than 10 year old son, till his nose was bleeding. damn scary. i'm never gonna move to bukit batok ever. its a scary place..

we then we to buy switches..
and many many plugs.. it was very much cheaper than we budgeted..!!
we went back to check on the completed air con piping.. hubby say its quite well done.. i noe nuts..
it looks alright to me.. much nicer than this noon... the walls are nicely plastered up.. and the boxes looks fine actually..
our kitchen tiles are actually all done. but no pics.. lazy.. jus imagine: a whole floor of nice tiles. hahaahah

ok. tireds.. nex time..

busy day..

the wires for our L box's lights..
more wires.. they're gonna start on the L box tml!
the air con man came too..
giant pipes for the air con..
the good--> there is no piping seen at the living room...
the bad--> it has to be at the corridor
the good--> the corridor is right at the end of the dining room and cannot be seen from the living room
the bad--> it has to run thru the study room
the good--> once the shelf is up, who will notice the pipes on top!!!! if you did, good for u.
the pipes will the run thru the masterbed room..
to the condenser...
there's not much choice... if only i can put the condenser anywhere i want and run my pipes thru any walls i want!!!

i've bought my lights. off to collect my clinicare spree and to buy my plugs and switches!

Sunday, May 25, 2008

more names..

li-ren tot of 2 new names for our future son and daughter.

boy: Clark, so he'll be Clark Kee

Girl: Boat, so she'll be Boat Kee

-_-"

Saturday, May 24, 2008

indi indi.....indiana jones...

totally away from the topic... cause i can't tink of another..
busy day again... the begining..
we went to our hse.. and the workers were working on saturday! they don't and can't actually, but quiet works as long as neigbours dont complain.. they've patched up the hacked wall..
they've patched up the wall!
this was done up between on the hacked wall for the tempered glass...
the hacked wall, and the balcony door is now in the 'make good' state..
the 'make good' balcony door is now merged into part of the living room..
door frame for the hacked door between the wardrobe room and masterbed room..our condenser ledge.. not really, it is actually other ppl's. its easier to take. its the same any way..
its big enuff for 2 condenser! which most rooms here need...
we went for our 2nd fitting today!
my cheongsum is done! and i TOTALLY LOVEEEEE the swavaski crystals which he added!! and we dint noe about it till today. so prettyss!!!
the sexy back which i love tooo.. hehe..
hope it'll turn out nicer in natural lightings.. the spot lights makes the lace looks like huge giant veins in pictures..
the wing-tipped shirt..
my yandao hubbaaaa!!!

bo leow.. end of exciting day. tonight is indiana jones nite.. cause yesterday we've watch this!

so we jus rented the past series which i havent watch.. and going on strong to watch tonight!

sleepies....

Thursday, May 22, 2008

progress progress!!

the orginal vanity sink and toilet bowl in the masterbed room, which have been dismantled. the shower area is at the other side.. yucki colour and tiles...
my kitchen toilet tings. which has all been dismantled too!! i dont like everything that is pink.
my kitchen wall tiles.. which i'm keeping.. cause.. luckily, its plain.. and cabinet, fridge gonna cover quite a big portion..
progress!!!
very hardworking uncle, we requested for the seams to be closer, cause our laundry one was not as close..
its half done!
ok. tml electrician doing our wiring!

Tuesday, May 20, 2008

kitchen 1/10 done..

our base for the suspended cabinet is done. hais. our kitchen is quite sads.. small. but boh bians. must compromise on certain things. can't get best of both worlds. it can't be totally suspended, cause its U shape, the cabinet would not be able to support the weight. but this cannot be seen from eye level. so it'll still appear suspended.

nex is gonna be the plumbing there thats suppose to be shifted. now contractor is waitin for us to meet the electrician, to do the false ceiling and the wiring, so that floor can be done..

hubby is not a good supervisor.. he have not contacted the electrician. and now contractor is waitin for us to finish the electricity stuff!!

ok. he needs to contract the electrician TOMORROW!!!!! and get this electricity tingy settled. thats y i hate to do all these contracting stuff. uncles are so difficult to be in contact. yucks. i can jus do the 'Art of Delegation' and can scold him for poor execution. muahahahahah

Monday, May 19, 2008

holiday is really over..

2nd consecutive day of swimming isn't that fun. my back aches. my arms ache. everywhere aches.

to make up for it, we went for selegie dao huay! and egg tart!

holiday holiday.....

noting much update from our hse... contractor pass us some vanity table top samples to chose our for our vanity sink..
and these...
he actually let us took all home.. tink we'll get one of the grey ones below.. to match our black toilet tiles...
the drawings on all our walls... to fill them up with sand i suppose...
and we even went swimming yesterday night!!!! cause it was freaking hot lah.
today we went shopping for li-ren's shoes to match his light grey suit for our photoshoot.. we were told to get a tappered, leather, white or off-white pair of shoes..
haha, the bag behind is his, the one in front is MINEEEE. wohooo!! of cause.. birks is not for the photoshoot..

i got this for free anyway! woho! hhaha. i used the voucher given by my company which i almost forgot.
the best of this pair is still.. its fweeeeeeeee!!! and ITS PINK!!! AGAIN!!
ok, dear dear's off white shoes... which we foresee he's gonna wear once oni... got from pedro with 15% discount!

Accuracy of Death by Takeshi Kaneshiro is quite boring. oni the ending was good, but the middle part.. i feel asleep.. if not for takeshi...

sads.. holiday finishing leow.. sink we gonna go swimming agains tonight...

Saturday, May 17, 2008

movie marathon

still tired from yesterday's bbq, but i had lotsa fun!!! woho!! and food of cause!

movie marathon day today... went to watch this.. and it was nicer than i expected! patrick dempsey is really cute!!!
we catching this at 930~!
not much significant progress to our hse... except our balcony floor tiles are done..